Skip to content
Aerial view of the Suria 22 Balakong industrial park under construction, showing completed and in-progress semi-detached factory blocks

Industrial — Under construction

Suria 22 Balakong Industrial Park

Kawasan Perindustrian Balakong, Seri Kembangan, Selangor

Jelita Megamas' flagship development: a gated industrial park of three-storey semi-detached factories in the established Balakong industrial belt, within the Cheras–Kajang corridor and minutes from the Klang Valley's main arterial routes.

Suria 22 is a development of three-storey semi-detached factory units within Kawasan Perindustrian Balakong, one of Selangor’s most established industrial addresses. The site sits inside the Cheras–Kajang corridor with direct access to Kuala Lumpur, Kajang, Seri Kembangan and Sungai Besi.

The brief was straightforward and demanding: industrial buildings that work hard, and look like they were designed. Each unit pairs a high-clearance production floor with a full-height office frontage, so an owner-occupier can run manufacturing and administration under one roof without compromising how the business presents itself to its own customers.

Construction is progressing block by block, with structural works, facade installation and fit-out running in parallel across the site. Target completion is December 2026.

Gallery

Artist impression of a Suria 22 corner factory unit showing the bronze clad upper floors and white gable frontage
Artist impression — corner unit
Artist impression of the Suria 22 factory frontages along the internal road
Artist impression — unit frontages and forecourt parking
Artist impression of two facing rows of Suria 22 factory units
Artist impression — approach between facing units
Artist impression of the Suria 22 units seen head on from the forecourt
Artist impression — frontage elevation
Artist impression of the side elevation of a Suria 22 factory unit
Artist impression — side elevation
Wide aerial view across the Suria 22 site showing the full block layout
Site overview
Block C-C1 structural frame complete, before facade installation
Block C-C1 — structure complete
Block B-B with facade cladding and glazing being installed
Block B-B — facade and glazing
Completed factory unit facade at Suria 22
Construction progress across the Suria 22 site
Factory block nearing completion at Suria 22
Internal access road and completed units at Suria 22

Other projects

View all